english deutsch
Logo MESSER
SCC** DIN ISO 9001:2015
Logo Messer

icon print
PRINT
WSM MESSER
Spezialmontagen GmbH


Power-Plant building

Montage Aschekuehler

Assembly of an ash cooler in the power plant in Walsum 2009

Montage Aschekühler/Installation of an ash cooler

Assembly of a MAGALDI – Ash-removal plant

Client:                             HITACHI Power Europe GmbH
Construction site:         Kraftwerk Walsum
Period of Assembly:     24.08.2009 - 26.02.2010


The works included the assembly of the MAGALDI ash-removal plant beneath the boiler plus the removal and intercalation of the ash next to the boiler house.

<<< zurück/back

(Updated: 06.01.2017 | 13:25



© 2024 by MESSER GRUPPE